Dimitry Department Relocations
Below is the list of departments and services that will be moved during Dimitry construction. Check back for ongoing updates.
For current office locations for faculty and staff, please use the employee directory.
Department & Services | Final Location for Fall 2019 |
---|---|
Academic Success Coaching |
Dimitry Building 2nd Floor |
Assessment Center |
Dimitry Building 45 Franklin St. L-135 1st Floor |
Bookstore |
Dimitry Building 45 Franklin St. L-026 Basement level |
Campus Security / Public Safety |
Dimitry Building 45 Franklin St. Lobby area 1st Floor Public Safety desk is located directly inside of the main entrance doors |
Civic Engagement |
Dimitry Building |
Community Relations |
Dimitry Building 1st Floor |
Computer Lab |
Dimitry Building 45 Franklin St. L-149 1st Floor |
Counseling Services |
Dimitry Building 1st Floor |
Early Childhood Education |
Dimitry Building |
Dental Assisting Program |
Dimitry Building 45 Franklin St. L-011, L-013 Faculty Offices: L-030 Basement level |
Financial Aid |
Dr. Ibrahim El-Hefni Allied |
Human Resources |
Dimitry Building |
International Student Services |
Dimitry Building 1st Floor |
IT Client Services |
Dimitry Building |
Learning Accommodations |
Dimitry Building 1st Floor |
Library |
Dimitry Building 45 Franklin St. L-007 (Basement Level) Info. Literacy Lab: L-151 1st Floor |
PACE |
Dimitry Building 1st Floor |
PK-12 (Early College) |
Dimitry Building |
Radiologic Technology Program |
Dr. Ibrahim El-Hefni Allied |
Student ID Cards |
Dr. Ibrahim El-Hefni Allied |
Tutoring Services
|
Dimitry Building |
Tutoring Services
|
Louise Haffner Fournier Building |
Math Lab |
Louise Haffner Fournier Building |
Vice President of Academic and Student Affairs Office |
Dimitry Building |